St. Paul Hebrew Institute, Apartments

Another building owned by the St. Paul Hebrew Institute was at 133 E. Fillmore.

There were four apartments in the building, but there is no information about the tenants. They may have been used for the people who came to use the large bath area.

In the 1960 Riverview Industrial Project surveys the assessor described the area in the basement of the building.

In his words, it was a "ritual Hebrew bath. There is an entry and reception room in front and an emersion room with extensive shower and bath facilities and sunken ceramic tile emersion pool. In connection with this bath, there are 2 concrete water storage tanks and a separate boiler for heating the pool water."

Images

Map